Salah Eddin
Road Rehabilitation / Gaza:
Comprehensive redevelopment design for 4700m
of the northern section of Salah Edditn road between the
Beit Lahia and Omar El-Mukhtar intersection. The project
included the preparation of detailed design and tender
documents for the following: Geometric and pavement design,
traffic design based on 4-lane divided highway, design of
the main trunks for the sewage collection networks from Gaza
and Jabalia, stormwater drainage, relocation of overhead
high-tension power lines, telephone lines and water
distribution network. The feasibility of two-level
intersection at Omar El-Mukhtar intersection was also
considered. Client: Municipality of Gaza, 1988.
-
Wadi El Salka
Road:
Detailed design of 2800 m of the main road in
Wadi El Salka. The work included the study of different
options for stormwater drainage. Client: PECDAR 1998.
-
Middle East
Regional Transport Study:
Local consultant for the project. The
objective of the study is to provide forecasts of the effect
of the Peace Process on the regional traffic corridors for
the years 2000,2010 and 2020. Client: European Communities,
1996.
-
Future
Transportation Infrastructure Needs for the Palestinian
People in the West Bank and Gaza Strip:
A comprehensive study presenting a general
description of the evaluation of the transportation sectors
in Palestine and analysis the existing transportation
infrastructure in the Occupied Palestinian Territory. The
study also proposes guidelines for developing a
transportation system for the future Independent State of
Palestine covering road, rail, sea, air and public
transportation networks and related industries including a
corridor connecting the inland region with the coastal
region. Client: United Nations Center for Human Settlement,
(Habitat), 1989.
-
Village Access
Roads (Inland Region):
Comprehensive design for rehabilitation and
maintenance of existing village access roads, widening of 3
m roads to 6 m roads, and the construction of new roads. The
work includes geometric and pavement design, intersection
details, retaining walls and culverts design and drainage.
The total length of access roads in the project is about
180km. Client: PECDAR, 1994.
-
Salfeet Road
Network:
Final design and working drawings for the
proposed internal roads 47km. The work included detailed
geometric and pavement design, traffic design, intersection
details and preparation of tender documents. In addition,
the project included substantial quantities of retaining
walls, culverts and water distribution, stormwater, drainage
and sewerage networks.
-
Tulkarm -
Shweikeh Connector:
Detailed design of a 120m 4-lane divided road
from Tulkarm to Shweikeh access. The work included
geometric and pavement design, traffic design, intersection
details and design of main sewage collection and stormwater
drainage trucks. Client:
Municipality
of Tulkarm, 1987.
-
Anabta Main
Road:
Comprehensive design for 1800m 4-lane divided
highway between Nablus and Tulkarm running through the town
of Anabta. The work included detailed geometric and
pavements design, traffic design, intersection details and
preparation of tender document. Client: Municipality of
Anabta, 1989.
-
Illar-Kufr Rai’-Arrameh Road:
Detailed design for two-lane connector road
linking the districts of Jenin and Tulkarm in the northern
part of the Inland region at the villages of Kuf Rai’ and
Illar. The total length of the road is about 7500m. The
work included detailed geometric and pavement design,
retaining walls and culverts, and full supervision of
construction. Client: UNDP, 1994.
-
Al-Ram Main
Road:
Detailed design of 3100m of the main road in
Al-Ram. The work included geometric and pavement design,
traffic design, intersection details, tender documents and
overall sites supervision. Client: Al-Ram Village Council,
1986.
-
Emergency Road
Rehabilitation Program (ERRP):
The recently launched project is financed by
USAID, and implemented by CH2MHILL, an international
consulting firm, in coordination with the relevant
municipalities. The Project purpose is to acquire quick
response, road rehabilitation services to restore the
affected transportation infrastructure in five Palestinian
Governorates in the West Bank and Gaza to its original
condition. CEP has been sub-contracted by CH2MHILL to carry
out the construction management services for the Project in
Ramallah, including Al bireh and Beitunia, Nablus and Jenin.
The Task Orders under the Project involve complete
reconstruction for some roads and rehabilitation for others,
including milling, patching and repaving, and curbstone
constructuion. Task Orders also include redesign of some
roads. Client: CH2MHILL, Project Value: US$10-12 million,
2003.
-
Jericho:
Internal road network masterplan (65km).
-
Qabatia:
Internal road network masterplan (22km).
-
Tubas:
Internal road network masterplan (32km) and a
traffic plan for the main street.
-
Silwad:
Detailed design of the proposed
Silwad-Nabluroad connector (5km).
-
Azariyyeh/Abu Dis:
Internal road network masterplan (62km).
-
Ya’bad:
Internal road network masterplan (30km).
-
Silet El-Dhaher:
Internal road network masterplan (33km).
-
Beit Lid:
Internal road network masterplan (24km).
-
Tel:
Internal road network masterplan (25km).
-
Jabalia:
Internal road network for the Jabalia Refugee
Camp.
-
Aqbat Jabr:
Internal Road Network for Aqbat Jabr Camp.
|
|